Installation and project management

Lab casework, fume hood and cleanroom installation with site verification, delivery logistics, phased work in occupied buildings and closeout.

Lab furniture arrives as hundreds of heavy, finished pieces that must be set level, anchored, joined and sealed in a building where other trades are still working. Installation is where good planning either pays off or comes apart. Our installation and project management service gives you one point of contact from order to handover.

We install casework, worktops, fume hoods, safety equipment and cleanroom components on new construction, renovations and phased work in occupied buildings.

What the service covers

  • Site verification. Field measurements before fabrication so casework fits the room as built, not only as drawn.
  • Scheduling. A schedule tied to the general contractor's program, with clear dates for rough-ins, deliveries and installation.
  • Logistics. Delivery routes, loading dock times, elevator bookings, staging space and protection of finished floors and walls.
  • Installation. Setting, leveling and joining casework, installing worktops and sealing joints, mounting wall cabinets and shelving, and setting fume hoods on their bases.
  • Anchorage. Fixing casework, tall cabinets and hoods to walls and floors, including seismic restraint where the design calls for it.
  • Trade coordination. Plumbing, gas, electrical and exhaust connections are made by licensed trades. We coordinate rough-in locations and the order of work with them.
  • Phased work. After-hours shifts, dust control and staged handovers for hospitals, schools and labs that stay in operation.
  • Closeout. Inspection, deficiency lists, cleaning, and handover documents.

Anchorage and any design changes found on site are confirmed with the project's engineer of record. Where stamped details are needed, they come from a professional engineer licensed in your province, and the local authority having jurisdiction carries out its own inspections.

How it works

  1. Pre-construction meeting. We meet the owner, contractor and design team to confirm scope, access, working hours and site rules.
  2. Site verification. We measure rooms and check rough-in locations for drains, water, gas, power and exhaust.
  3. Schedule and logistics plan. We set delivery sequences and staging, working back from the date each room must be ready.
  4. Delivery and staging. Items arrive in installation order, are checked for damage and are moved to their rooms.
  5. Installation. Crews install casework, worktops, hoods and equipment, then the trades make their connections.
  6. Inspection and deficiencies. We walk each room with you, list any deficiencies and correct them.
  7. Handover. We hand over documents and arrange hood testing before the lab is occupied.

Our guide to lead times, delivery and installation explains how long each stage usually takes and what affects it.

What you receive

  • Installation schedule coordinated with the general contractor
  • Site-verified drawings
  • Delivery and staging plan
  • Regular progress reports
  • Deficiency lists and sign-off records
  • As-built drawings
  • Care and maintenance instructions and warranty documents
  • Fume hood test reports, through our fume hood testing service or your own testing provider

Typical projects

  • Fitting out a new science building floor by floor
  • Replacing casework in a hospital lab one zone at a time while the rest stays open
  • Installing new hoods and benches in a school lab over a summer break
  • Assembling a modular cleanroom inside an existing building
  • Coordinating furniture, hoods and equipment from several suppliers on one site

Working in occupied buildings

Renovations in live labs and hospitals need extra care: barriers, negative air where infection control requires it, quiet hours, and clear routes for people who are still working. Our lab renovation planning guide covers how to phase that work.

To plan installation for your project, request a consultation.