LaboratoryEquipment.caCasework · Fume hoods · Cleanrooms Placeholder data
Services

Engineering

Lab ventilation, exhaust, utilities and seismic engineering support, with stamped work by professional engineers licensed in your province.

Lab furniture and fume hoods only work as well as the building systems behind them. A hood with poor supply air, an undersized exhaust fan or a missing drain will fail no matter how well it was built. Our engineering service connects the lab layout to ventilation, utilities and structure.

All stamped engineering is done by professional engineers licensed in the province where the project is built (P.Eng., or ing. in Quebec). On most projects, the client already has an engineer of record for the building. We work with that engineer, supplying calculations and coordination, or take on a defined scope ourselves when engaged to. Either way, the engineer of record and the local authority having jurisdiction govern the final design.

What the service covers

  • Lab ventilation. Exhaust volumes for fume hoods and other exhausted devices, room supply air, makeup air, pressure relationships between rooms, and air change rates.
  • Hood control strategy. Constant volume, bypass or variable air volume, and how hoods interact with room controls. Our guide to bypass, CAV and VAV hoods explains the options.
  • Supply air and cross drafts. Diffuser placement and terminal velocities near hood faces, which strongly affect containment. See cross drafts and supply air.
  • Exhaust systems. Duct materials, manifolded or individual exhaust, fan selection and stack design with reference to ANSI/AIHA Z9.5 and CSA Z316.5.
  • Specialty exhaust. Dedicated exhaust for perchloric acid hoods with washdown, radioisotope hoods and acid digestion.
  • Lab utilities. Lab gases, vacuum, purified water, drainage and acid neutralization, plus electrical loads for equipment.
  • Seismic restraint. Anchorage of casework, tall cabinets, shelving and hoods where the National Building Code requires seismic restraint of non-structural components.

How it works

  1. Scope and data. We agree on what we are responsible for and collect existing drawings, equipment lists and the hood schedule.
  2. Site survey. For renovations, we check existing ductwork, fans, shafts, utilities and structure.
  3. Basis of design. We set design criteria such as hood face velocities, sash positions, room pressures and diversity, and confirm them with the owner and engineer of record.
  4. Calculations. We size exhaust and supply air, utilities and anchorage.
  5. Coordination drawings. We place hoods, ducts, services and equipment in one coordinated model and resolve clashes.
  6. Review and stamping. The engineer of record reviews our work. Where we hold the scope, our licensed engineer seals the drawings.
  7. Construction support. We answer site questions, review submittals and support commissioning and hood testing.

What you receive

  • Basis-of-design memo
  • Exhaust and airflow calculations, with a fume hood schedule listing design flows and sash positions
  • Room pressurization and air balance schedule
  • MEP coordination drawings showing hoods, ducts, services and equipment
  • Utility load schedules for gases, water, drains and power
  • Seismic anchorage details, stamped where required
  • Input to the controls sequence of operations
  • Site review reports during construction

Typical projects

  • Adding fume hoods to an existing lab and checking whether the exhaust system can carry them
  • Converting constant volume hoods to variable air volume to reduce energy use
  • Designing exhaust for a new perchloric acid or radioisotope hood
  • Anchoring casework and tall storage in a seismic region
  • Coordinating hood and casework layouts with a mechanical engineer on a new building

Why it matters

Fume hoods are among the largest energy users in most science buildings, and their containment depends on how the room delivers air to them. Engineering decisions made early, such as how many hoods, at what flow, with what controls, shape both safety and operating cost for decades.

To discuss your building systems, request a consultation.