Good labs start with a clear picture of the work. Our planning and consulting service turns what your people do, the equipment they use and the hazards they manage into layouts, schedules and specifications that an architect, engineers and contractors can build from.
We work as a lab planning consultant to the owner, alongside the architect, or as a sub-consultant to the design team. The service suits new buildings, renovations, office-to-lab conversions and consolidations of several labs into one.
What the service covers
- Programming. We document users, activities, sample and material flows, equipment, chemicals and biological agents, and expected growth.
- Space planning. We size each room, group spaces by hazard and function, and set adjacencies such as lab to support room, prep room to teaching lab, or gowning room to cleanroom.
- Planning grid. For larger projects we propose a lab module so labs can be refitted without moving walls.
- Equipment and casework selection. We match casework, worktops, fume hoods and storage to the work, using our catalog where it fits and custom items where it does not.
- Hood and ventilation inputs. We count and size fume hoods and other exhausted devices, then hand that information to the mechanical engineer.
- Budget planning. We prepare quantity schedules that let your cost consultant or project manager price the work early.
Planning decisions that touch building systems are confirmed by the project's engineer of record and the authority having jurisdiction. Where stamped engineering is needed, it comes from a professional engineer licensed in your province, through our engineering service or your own consultants.
How it works
- Kickoff and site review. We meet the project lead, visit the space or review drawings, and agree on scope, schedule and who signs off each stage.
- User interviews. We talk with lab managers, researchers, technicians and safety staff about how work actually happens today and what gets in the way.
- Program and equipment matrix. We write up the program and list every piece of equipment with its size, utilities, heat output and exhaust needs.
- Concept layouts. We prepare 2D layouts and a 3D model, often starting from a ready-made layout in the lab planner so users can see options quickly.
- Review workshops. Users mark up the layouts. We test alternatives for bench lengths, hood positions, storage and aisles.
- Design development. We refine the chosen layout, add elevations and specifications, and coordinate with the architect and engineers.
- Tender and handoff. We support pricing, answer bidder questions and hand a complete package to the installation team.
What you receive
- Programming report with room-by-room requirements
- Equipment matrix covering sizes, power, data, water, drains, gases, heat loads and exhaust
- Room data sheets for each lab and support space
- 2D layouts and a 3D model of each room
- Casework elevations and a furniture and fume hood schedule
- Service requirements for mechanical, electrical and plumbing design
- Quantity schedules for budget pricing
Typical projects
- A university converting older teaching labs into flexible research space
- A hospital lab reorganizing around new analyzers while staying in service
- A testing company moving from a leased unit into a purpose-built facility
- A school board standardizing science labs across several schools
- A startup fitting out a shell space for its first wet lab
Each of these benefits from the same discipline: understand the work first, then draw. Our guide to planning a lab layout shows the steps in more detail, and the lab types section gives starting points for many common labs.
When to bring us in
The earlier the better. The program sets room sizes, hood counts and service needs, and those drive the building design. Bringing a lab planner in after the floor plate is fixed often means fitting the lab to the building instead of the other way round.
Ready to talk about your project? Request a consultation.