The HVAC system is what makes a cleanroom clean. Walls, doors and finishes keep contamination out, but filtered air is what dilutes and removes the particles people and processes generate inside. It is also the largest part of most cleanroom budgets and energy bills. Understanding how airflow is specified helps owners ask better questions and avoid paying to move air the process does not need.
Air changes per hour
Air changes per hour (ACH) is the volume of filtered supply air delivered each hour divided by the room volume. A room 6 m × 5 m × 2.7 m high (about 20 × 16 × 9 ft) holds 81 m³. At 40 ACH it needs about 3,240 m³/h, or roughly 1,900 cfm, of HEPA-filtered air.
ISO 14644-1 does not set air change rates. It sets particle limits, and the airflow needed to meet them depends on the room. Even so, designers start from rules of thumb, and published ranges vary widely. Common starting points for non-unidirectional rooms are:
| ISO class | Typical starting range (ACH) | Notes |
|---|---|---|
| ISO 8 | about 10 to 25 | Support rooms, anterooms, packaging |
| ISO 7 | about 30 to 90 | Lower end common in pharmacy, higher in busy manufacturing |
| ISO 6 | about 100 to 240 | Usually high filter coverage |
| ISO 5 | 240 and up, or unidirectional | Critical zones are usually designed by air velocity instead |
Where an ISO 5 zone uses unidirectional flow, the design figure is air velocity, commonly around 0.36 to 0.54 m/s (about 70 to 105 fpm), rather than ACH. Some standards set minimums for particular uses; USP <797>, for example, sets minimum air changes for compounding rooms.
These ranges are where the conversation starts. The HVAC engineer sets the real figure for each room.
What actually sets the airflow
- People. Each gowned person still releases particles, more when moving. Occupancy is often the biggest single input.
- Process. Machines, open product, powders and heat sources add particles and heat.
- Heat load. In many cleanrooms the air needed to remove heat from equipment, lights and fan motors exceeds the air needed for cleanliness.
- Recovery. How fast the room returns to its class after a disturbance. ISO 14644-3 describes a recovery test, and EU GMP has long cited a clean-up period of 15 to 20 minutes as a guidance value. Recovery data from a similar room is better evidence than any rule of thumb.
- Return location. Supply from the ceiling and return through low-wall grilles near the floor sweeps particles down and out of the breathing and work zone. Ceiling returns in non-unidirectional rooms can short-circuit the supply air.
System architectures
Most cleanrooms use one of three arrangements:
- Central air handler with ducted HEPA terminals. All air passes through one conditioned system and terminal filters in the ceiling. This is common in pharmaceutical facilities because control and documentation are straightforward. It needs a larger air handler and duct runs.
- Make-up air handler plus fan filter units. A smaller air handler conditions and pressurizes the plenum, while fan filter units recirculate room air at high volume. This is common for modular ISO 5 to ISO 7 rooms. The FFU motor heat must be removed, usually with a dry cooling coil in the recirculation path.
- Recirculating air handler with a dedicated outdoor air unit. One or more units recirculate room air through cooling coils and filters, while a separate unit supplies treated outdoor air.
In every case, outdoor air supplies ventilation for occupants, replaces any air exhausted, and creates the offset that pressurizes the room. Staged prefilters protect the final HEPA filters and extend their life. The offset ties directly to the pressure cascade.
Temperature and humidity
Cleanrooms usually run cooler than offices because gowned staff overheat. Humidity matters both ways: too dry raises static and discomfort, too humid encourages microbial growth and can affect hygroscopic products. Agree the design conditions early with your quality and production teams, because they size the cooling and dehumidification plant.
Cutting energy without cutting cleanliness
- Base airflow on recovery testing and heat load, not on the top of a rule-of-thumb range.
- Use EC fans and low-resistance filters, and track pressure drop to replace filters on condition.
- Provide a reduced-flow mode for unoccupied periods that still holds the pressure cascade, and qualify it before use in a regulated room. ISO 14644-16 gives guidance on energy efficiency.
- Keep the cleanest zones small, and use local clean air devices where possible.
- Seal the envelope so the offset air needed for pressure stays low.
Questions to ask your engineer
- What air change rate or velocity is proposed for each room, and what drives it: particles, heat or a standard?
- How will recovery time be verified at commissioning?
- What happens to pressure and cleanliness during setback, filter loading and power failure?
- What redundancy is provided for fans and controls in critical rooms?
- How will airflow, pressure, temperature and humidity be monitored and trended? See certification and monitoring.