LaboratoryEquipment.caCasework · Fume hoods · Cleanrooms Placeholder data
Lab type · 9 × 6.6 m starting room

Electronics and semiconductor cleanroom

Planning an electronics or semiconductor cleanroom: ISO 5 and 6 classes, wet benches, air showers, ESD control, services and stainless furniture.

Electronics and semiconductor cleanroom starting layout in 3D

Electronics cleanrooms range from university microfabrication bays to production lines for sensors, optics, circuit assemblies and semiconductor packaging. Process engineers, technicians and graduate students work inside, running photolithography, wet etching and cleaning, thin-film deposition, wire bonding, inspection and test. A single particle can kill a device or ruin a pattern, so the room exists to keep particles off the product, and the gowning, airflow and furniture all serve that goal.

Hazards and containment

Two kinds of protection run side by side. Product protection comes from the cleanroom class, typically ISO Class 5 or 6 under ISO 14644-1 for process bays, with local ISO 5 or better at critical steps. People protection comes from chemical and gas controls, because the bay also contains:

  • Wet benches with acids, bases and solvents, including hydrofluoric acid and strong oxidizing mixtures in many fabs
  • Toxic, flammable or pyrophoric process gases, delivered from gas cabinets outside the room
  • Cryogenic liquids and high-pressure nitrogen
  • UV light from aligners and exposure tools
  • Electrostatic discharge, which harms devices rather than people

Wet chemistry happens in exhausted wet benches or fume hoods inside the cleanroom, with separate benches for acids and solvents. Keep flammable and corrosive storage in separate ventilated cabinets on different walls.

Equipment and furniture

  • Acid and solvent wet benches, with liners chosen for the chemistry
  • A laminar flow clean bench for critical assembly or inspection
  • Spin coaters, hot plates and mask aligners in a lithography area under yellow light
  • Inspection microscopes and probe stations on stable stainless tables, with a vibration-isolated table for the most sensitive tools
  • An air shower at the personnel entry, a door for equipment and exit, and a pass-through for wafers and parts
  • Flush viewing windows so visitors and supervisors stay outside

Layout principles

Lay out the room so air moves from the cleanest work toward the dirtiest. In a non-unidirectional ISO 6 room, fan filter units cover a substantial part of the ceiling and returns run low along the walls. Put the cleanest process, such as lithography or critical inspection, under the densest filter coverage and away from doors. Place wet benches along a wall with exhaust and drains, away from the entry and the main aisle.

Separate personnel and material flow. People gown outside, pass through an air shower and enter the bay; materials come in through the pass-through after wipe-down. Keep a clear route from the wet benches to the emergency shower and eyewash, which must stay reachable even in a gowned area. Leave service access behind tools; in larger fabs this becomes a separate service chase.

Finishes and furniture materials

Every surface should be non-shedding, cleanable and compatible with the chemistry. Stainless steel casework and tables are the default in most bays, with perforated or open designs where air needs to pass through. Acid wet benches use polypropylene or a PVC liner; solvent benches use stainless. Work surfaces at assembly and test stations should be grounded or static dissipative as part of an ESD control program. Walls, ceilings, floors, windows and lights must be flush and sealed.

Utilities and services

  • Fan filter units or ducted HEPA supply, with tight temperature and humidity control
  • Process exhaust split into acid, solvent and general streams
  • Ultrapure deionized water and process cooling water
  • Clean dry air, nitrogen and vacuum at each tool
  • Process gas lines from external gas cabinets, with gas detection
  • Dedicated power with good grounding, and UPS for sensitive tools
  • Sealed penetrations for every service, as set out in sealing penetrations

Compliance points in Canada

ISO 14644-1 sets the cleanliness classes and how to test them, and ISO 14644-2 covers ongoing monitoring. Wet benches and fume hoods should be tested against CSA Z316.5 where they serve as hoods, and NFPA 45 and the National Fire Code of Canada govern chemical quantities and storage. Hazardous production gases bring extra fire code and gas detection requirements that your engineer of record will define. The emergency shower and eyewash should meet ANSI Z358.1.

About the starting layout

The 3D starting layout is a 9 by 6.6 m (30 by 22 ft) ISO 6 bay with an acid wet bench, a solvent hood, a laminar flow clean bench and a vibration-isolated table along the back wall, stainless tables for lithography and inspection, separate acid and flammable cabinets and an emergency shower. The entry wall holds an air shower, a cleanroom door with a pressure monitor, a pass-through and a viewing window, with a second window on the side wall. Adapt it in the lab planner or book a consultation.

Starting layout: bill of materials

17 items in a 9 × 6.6 m room with a 3 m ceiling, built as an ISO 6 cleanroom shell. Budgetary list prices; adjust anything in the planner.

CodeProductQtyUnit
BT-GR-1200Anti-vibration balance table1$3,100
CR-AS-1300Air shower1$22,500
CR-DP-0150Room pressure monitor1$640
CR-FW-1200Cleanroom flush window, double-glazed2$1,780
CR-HD-1000Cleanroom door with vision panel1$3,900
CR-PT-0600Pass-through chamber, interlocked1$3,400
CR-WT-1500Stainless cleanroom work table3$1,520
CR-WT-1800Stainless cleanroom work table1$1,690
ES-CB-0600Emergency shower & eyewash1$1,850
FH-BP-1800Benchtop fume hood, bypass
Stainless steel 304 · PVC liner (acid digestion)
1$20,430
FH-BP-1800Benchtop fume hood, bypass
Stainless steel 304 · Stainless 316 liner
1$19,770
LF-H-1800Laminar flow clean bench, horizontal1$11,200
SC-CR30-1090Corrosives cabinet, 30 gal1$2,290
SC-FL45-1090Flammable liquids cabinet, 45 gal1$2,480
SHELLModular wall panels, 94 m²1$29,020
SHELLWalkable ceiling grid, 59 m²1$15,440
SHELLCoved sheet vinyl floor, 59 m²1$5,640
SHELLFan filter units with HEPA × 291$60,900
SHELLSealed LED panels × 141$7,840
SHELLControls, pressure monitoring and electrical1$2,670
Starting layout total$222,880

Key products for this lab